Visual Materials
C1.3 - Maps
You might also be interested in

C1.3 - Maps - Drawing
Visual Materials
C1.3 - Maps - Drawing - "Pagett" -- Florence Lake Tunnel. [Profile crossectional drawing with "head" for Powerhouses 1, 2, 2A, 5, 8, 3, & 4. PH 5 was never built and design for PH4 shows a long tunnel from PH 3 to PH4 forebay that was not part of the constructed design].
photCL SCE 02 - 10608

C1.3 - Maps
Visual Materials
C1.3 - Maps - Map of Big Creek development showing Powerhouses 1, 2&2A, 8, and 3.
photCL SCE 02 - 13579

C1.3 - Maps - Drawing
Visual Materials
C1.3 - Maps - Drawing - "Pagett" Big Creek Project [includes several powerhouses that were never built]
photCL SCE 02 - 10613

C1.3 - Maps
Visual Materials
C1.3 - Maps - Map of the Big Creek and Shaver Lake area
photCL SCE 02 - 05118

C1.3 - Maps
Visual Materials
C1.3 - Maps - Relief map of Big Creek-San Joaquin River Development [existing & proposed].
photCL SCE 02 - 13284

C1.3 - Maps
Visual Materials
C1.3 - Maps - Big Creek development map. Exhibit B - includes northern diversions and plants that were never built.
photCL SCE 02 - 08147