Visual Materials
Boulder-Chino Transmission Line (3rd)
You might also be interested in

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hand erection of tower at M64T3.
photCL SCE 02 - 24474

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - Erection of Tower at Mi. 89-4
photCL SCE 02 - 20247

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - Erection of Tower at Mi. 89-4
photCL SCE 02 - 20248

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Storm damage near M42T2. Looking southeasterly along wash. Taken from tower bridge.
photCL SCE 02 - 26740

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Camera at a position west of tower M61-4 and facing northeast. A partly unloaded trailer seen through tower leg. Edison Co. car on road, can of chlorinated lime at rear wheel.
photCL SCE 02 - 27466

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Camera at a position south of tower M61-3 and facing north. Note tower # on leg at left trailer loaded with chlorinated lime in 40# cans parked off road near tower. Edison Co. car on road at left edge.
photCL SCE 02 - 27465