Long Beach Steam Station, Plant #2 - Progress construction of 8-R
You might also be interested in

Long Beach Steam Station, Plant #2 - Units 7 & 8 removal - storage yard
Visual Materials
Long Beach Steam Station, Plant #2 - Units 7 & 8 removal - storage yard [Plus three additional shots of 7 & 8 removal - #25402, #25403: Storage area northwest of Unit 10, Plant 3, & #25404: Storage and repair area) on same photocard].
photCL SCE 02 - 25401

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Unit #7 18th stage Heator Drip Pump. [Plus two additional Unit #7 shots (#25165: Main turbine & generator, & #25166: Turbine end of main Unit) on same photocard].
photCL SCE 02 - 25164

Long Beach Steam Station, Plant #2 - Units 7 & 8 removal - storage area
Visual Materials
Long Beach Steam Station, Plant #2 - Units 7 & 8 removal - storage area[Plus three additional shots of 7 & 8 removal - #25406: crating #7 in area northwest of Unit 11, #25407: Storage area southwest of Unit 11, Plant 3, & #25408: Storage and cleaning area) on same photocard].
photCL SCE 02 - 25405

Long Beach Steam Station, Plant #2 - Unit 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Unit 8-R - Congestion in condenser floor aisle as a result of 8R construction. [Plus three additional shots (#25451: Congestion around base of #7 as a result of removal of 7 & 8 and construction of 8R, #25452: Congestion around Unit #9 as a result of 8R construction, & #25453: Congestion around base of #7 as a result of removal of #7 & #8 and the construction of 8R) on same photocard].
photCL SCE 02 - 25450

Long Beach Steam Station, Plant #2 - Unit 8-R
Visual Materials
Long Beach Steam Station, Plant #2 - Unit 8-R - [?] turbine supports. [Plus three additional shots (#25455: Typical conduit bends & supports, #25456: trenches in floor under condenser, & #25457: assembly high pressure end Unit 8R) on same photocard].
photCL SCE 02 - 25454

Long Beach Steam Station, Plant #2
Visual Materials
Long Beach Steam Station, Plant #2 - Cleaning & repair for units 7 & 8. [Plus three additional shots (#25429: Preparing foundation for #9 west circulating water pump, #25430: Progress construction of Unit 8-R, & #25431: Installing evaporator & condensate booster pump for Unit 8-R) on same photocard].
photCL SCE 02 - 25428