Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M216-T3 alongside first Boulder-Chino T/L.
photCL SCE 02 - 24424

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Clipping in at M141-T3
photCL SCE 02 - 23277

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting bird guards at M208-T3.
photCL SCE 02 - 23552

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - "Meggering" Insulators at Tower M18-T3.
photCL SCE 02 - 23244

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductor with winch tractor at M201-T3.
photCL SCE 02 - 23544

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Drill rig with 30" bucket in position for drilling, etc. M187-T3
photCL SCE 02 - 23251