    Borel Powerhouse - Borel Canal - Placing 3" mesh reinforced concrete floor over existing floor at station 3+00.

    photCL SCE 02 - 30548

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Placing concrete floor slab in cut-over canal

    photCL SCE 02 - 40199

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing floor lining.

    photCL SCE 02 - 30562

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Gunite in place South of Borel Bodfish Flume before placing invert concrete.

    photCL SCE 02 - 29262

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Picture taken on 2/12/1951, first days placement of 3" concrete floor slab near Borel Headworks by Johnson-Western.

    photCL SCE 02 - 30547

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945

    photCL SCE 02 - 30546