Big Creek Powerhouse #3



You might also be interested in

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Progress picture taken from house 13 looking toward site of houses 7 to 12 inclusive. [Sewer and water line tunnel excavated in road in front of these houses. Water and sewer pipe strung out along trench, ready for installation.]

    photCL SCE 02 - 41615

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Progress picture looking east from house 16, showing excavated bench for houses 17 to 24 inclusive. [Sewer and water line trench excavated in road in front of these houses.]

    photCL SCE 02 - 41616

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Graded site for 40,000 gallon steel water tank on foreground. Trench excavation in progress for 6" water supply line to tank in background.

    photCL SCE 02 - 41617

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Progress picture from downstream end of trench excavation for twin concrete conduits through the Isabella Auxiliary Dam. Forms for base of concrete gate structure being built in background.

    photCL SCE 02 - 40213

  • Big Creek Powerhouse #3 - PH #3 - Machine Shop

    Big Creek Powerhouse #3 - PH #3 - Machine Shop

    Visual Materials

    Big Creek Powerhouse #3 - PH #3 - Machine Shop - clearing steel and forms immediately after placing concrete.

    photCL SCE 02 - 27450

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - View looking North showing erection of forms for construction above early spring work on Arches 13 & 14, excavation for Arch 15, tramway trestle, West mixing plant, and West chuting towers in background, interados forms being erected for Arch 13, and concrete placing for Buttress 12 in progress.

    photCL SCE 02 - 12646