Visual Materials
Construction of Big Creek Powerhouse 1 and 2
You might also be interested in
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Sluicing construction sites; Camp 2 Warehouse; Meat storage and butchers; Concrete mixers; Camps 3, 6, and 7; Adit 2, and 3; Cascada yards; Transmission line construction; Excavation and construction at Dams 1, 2, 3, and 4, flowline, penstocks, surge shaft; Incline railway; Tunnels 1, and 2; Huntington Lake. Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Big Creek: Powerhouse No. 1 (part 2)
Visual Materials
Photographs of Powerhouse No. 1, Part Two. Photographs of drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV autotransformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flowline, incline hoist.
photCL SCE
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Huntington Lake sawmill and logging; Camps 1a, 2, 6, and 7; Dams 1, 3, and 4; Incline railways; Penstocks; Flow pipes; Interior and exterior views of Powerhouse 1 and Powerhouse 2 construction; Tunnel 1; Incline railways. Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Stone & Webster Engineering Corp. - Big Creek construction photos
Visual Materials
Early construction photographs of Big Creek, including construction of Penstock 2 and Powerhouse 2; East portal Tunnel 4; Adit 5, backfill on flowline, incline railroad No. 2, Adit 3 Tunnel 2, 84" flowline installation, site for Powerhouse No. 2, Penstock No. 1, and Powerhouse 1 construction. Photographs by Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2 [Locomotive No. 11 in snow; snow survey; Construction Camps 1F, 2, 6, and 7; excavation tunnels 1 and 2; construction at Dams 1, 2, 3, and 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.] Photographer: Stone & Webster Engineering Corporation.
photCL SCE
Image not available
Big Creek Powerhouse No. 1, Maintenance
Visual Materials
Powerhouse 1 and penstocks, Dam 4 sluicing, switchrack, switchboards in Powerhouse 1, Unit 1 fire, bucket strain-gauge test, bucket molds, bucket repairs, lapping journals, coil replacements in stator, rebuilding Unit 4, removing rotor for repair, break in penstock at Powerhouse 1, debris and boulders that washed into the powerhouse after penstock break, and details of ripped penstock.
photCL SCE