    Long Beach Steam Plant No. 1

    Visual Materials

    Construction and operation of Long Beach Steam Plant No. 1: early construction shots showing pile driving for foundation, stack construction, intake excavation, overviews from bridge.

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 2

    Visual Materials

    Construction Photographs of Plant No. 2 at Long Beach Steam Station. [Several of the 8x10 photographs in this album are labeled as "Plant No. 3" construction. These photographs are actually showing the four unit expansion of Plant No. 2. The first foundation pile for Plant No. 3 was driven on February 5, 1927.]

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    Construction of Long Beach Steam Plant No. 1, showing framing stages during construction of steam plant and equipment installation at the plant.

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 2

    Visual Materials

    Construction Photographs of Plant No. 2 at Long Beach Steam Station.

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    Construction and operation of Long Beach Steam Plant No. 1: assembly turbine No. 1, generator room, boiler room, transformer house, overview from top of [Salt Lake] Bridge.

    photCL SCE