Visual Materials
Long Beach Steam Station No. 2 and No. 3
You might also be interested in
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.
photCL SCE
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.
photCL SCE
Image not available
Long Beach Steam Station
Visual Materials
Long Beach Steam Station - Plant 3 construction photos, turbo installation, Boiler #50, laying 15" gas main, to L.B.S.S., driving piles for Unit #11, take-off towers, towers at channel crossing, installing transformers and oil switches, Switching Garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab., fuel oil pump room, exciter, piles ready for steel.
photCL SCE 13 - vol 092
Image not available
Long Beach Steam Station
Visual Materials
Long Beach Steam Station - Plant 3 construction photos, superheater, header, boiler assembly, skylight over Turbo Room, flu opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.
photCL SCE 13 - vol 094
Image not available
Long Beach Steam Plant No. 1
Visual Materials
End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.
photCL SCE

Long Beach Steam Station, Plant #3 - Interior of Turbo Room
Visual Materials
Long Beach Steam Station, Plant #3 - Interior of Turbo Room - Installing Condenser
photCL SCE 02 - 16382