Visual Materials
Pisgah Substation Site - with rough grading completed
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Airplane damage on Pisgah-Chino 220 kV line at M203 T3.
photCL SCE 02 - 26697
Image not available
Construction of Barre-Lighthipe Transmission Line and others
Visual Materials
Construction of Barre-Lighthipe Transmission Line; Eagle Rock-Gould Transmission Line [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell transmission line; Pisgah Substation construction, and Boulder-Chino transmission line.
photCL SCE

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Completed first and 2nd Boulder Lines M1-T1
photCL SCE 02 - 23243

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [men grading tower site with small bulldozer].
photCL SCE 02 - 19880

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [men grading tower site near access road].
photCL SCE 02 - 19881

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tower M0-T5 with wire stringing completed and bird guards etc. placed.
photCL SCE 02 - 23242